AI
Estates AI
Launch tool ▸
RIBA Stage 0–1 · Feasibility

Feasibility intelligence
for capital projects.

Answer a guided questionnaire and get a complete NRM1 cost estimate, RIBA stage programme and risk register — a costed, programmed Stage 1 report in minutes, not weeks.

~10–15 MIN · PROGRESS AUTO-SAVED · ON-SCREEN + .DOCX + PDF EXPORT

NRM1
Cost methodology
S1–S6
Programme size bands
0
AI-invented figures
90 days
Shareable report links
What the report includes

Every report, four deterministic pillars

01

NRM1 Cost Estimate

Order-of-cost with low, mid and high ranges, built deterministically from NRM1 benchmark rates, BCIS location factor, prelims, fees, risk and inflation. No figure is ever invented.

02

RIBA Programme

Stage-by-stage design, surveys, planning and construction durations — size-banded and adjusted for complexity modifiers, with a Gantt overview.

03

Risk Register

A project-specific risk table, RAG-rated and seeded deterministically from your inputs, with mitigations written in plain English.

04

Procurement Advice

A recommended contract form and procurement route matched to your priorities, programme and project complexity.

Ready to scope a project?

Answer the questionnaire and download a board-ready report.

Begin assessment ▸